Tucson, Arizona · Unified Development Code, Article 7A

Tucson sign permit: fees from $82.50, and 3 sq ft of sign per foot of frontage

By USSignCode Editorial · Last updated November 2, 2026 · How we check this page

Tucson regulates signs in Article 7A of its Unified Development Code, and the Planning and Development Services Department (PDSD) issues the permit. How much sign you may have depends on your zone and how long your street frontage is; each sign type then has its own limits. This page covers those limits, a checker, the fee table, and the points we could not confirm.

Historic storefronts and signs on a main street

Tucson sign permit at a glance

QuestionShort answer
Do I need a permit?For nearly every sign, yes. Putting up, changing, repairing, moving or re-lettering a sign with no permit is a civil infraction, and every day it stays counts again (§7A.4.1(A)). Window signs under a 30% glass cover and a few flags and murals are the main exceptions. Other cities compared.
How big can my sign be?The cap is a total for the frontage: 3 sq ft per lineal foot of street frontage in general business zones, 4 sq ft in industrial zones, a flat 20 sq ft in the O-1 office zone (§7A.10.2(B), Table 2) (limits by sign type). Other cities compared.
What does it cost?A permit fee of $82.50 to $618.75 set by the value of the sign work, plus review fees for each review needed and a $16.50 archive fee on every permit (City Sign Fees sheet) (fees). Other cities compared.
How long does it take?The City prints no review time for signs; its page tells applicants to email the sign permits desk for timing (timing). Other cities compared.
How long is the permit good for?It lapses if work has not begun within 180 days of the permit date, or if work then stops for 180 days. One extension of up to 180 days can be granted (§7A.4.2(D)).
Sidewalk A-frame sign?Allowed in business and industrial areas for a one-year authorization with a city decal, at 30 by 30 inches, one per business. In the public right-of-way it also needs a temporary revocable easement (§7A.10.3(C)(1)) (sidewalk signs). Other cities compared.
Blade or projecting sign?Permitted only inside a Historic District or the Pedestrian Business District, and one that hangs into the right-of-way also needs approval from the Department of Transportation (§7A.10.2(C)(3)(c)). Other cities compared.
Grand opening banner?A wall-mounted temporary banner is allowed in commercial and industrial zones: one per street frontage, up to 90 sq ft, for 90 days in a calendar year (§7A.10.4(A)(2)) (banners). Other cities compared.
Digital or LED sign?Digital copy may change no more than once a minute and may not animate or transition (§7A.6.4(C)). The City asks for a manufacturer letter on any electronic message display, with dimming to 200 nits at night (Sign Review Checklist). Other cities compared.
Already installed without a permit?The code calls it a civil infraction with a separate offense for each day (§7A.4.1(A)(2)). We did not find a fine amount in Article 7A, which sends penalties to Article 10 (§7A.5). Other cities compared.

Size limits Checker Fees How to apply Timing No permit Sidewalk signs Banners and other types What we could not confirm FAQ

In Tucson the zone and your street frontage set the ceiling, and the sign type sets the shape.

Article 7A first multiplies the length of your street frontage by a figure for your zone category. That total covers every permanent sign on the premise, so a wall sign, a monument sign and a canopy sign all draw from it. Each type then has a separate limit on area, height and placement. A corner lot gets the allowance once per street frontage, and moving unused area from one frontage to another needs the Zoning Administrator’s sign-off (§7A.6.9(C)).

Tucson sign limits by zone and sign type (UDC §7A.6 and 7A.10)

Tucson groups its zones into categories. The figures below are for the two that cover most storefronts: general business (O-2, O-3, P, RV, NC, RVC, C-1, C-2, C-3, OCR-1, OCR-2, MU, U) and industrial (P-I, I-1, I-2). Individual zones, the Historic District, the Pedestrian Business District, the Scenic Corridor Zone and planned area developments can be stricter, so read the section for your parcel.

ItemWhat is allowedSection
Total permanent sign areaGeneral business: 3 sq ft per lineal foot of street frontage. Industrial: 4 sq ft per foot. Within 250 ft of a freeway, a commercial, office or industrial frontage gets 4 sq ft per foot. Office zone O-1: 20 sq ft in all§7A.6.2, §7A.10.2(B) Table 2
Residential and multifamily zonesRural and single-family zones: 20 sq ft for residential uses and for nonresidential uses on local streets, 100 sq ft for nonresidential uses on arterial or collector streets. Multifamily zones: 50 sq ft, or 100 sq ft on arterial or collector streets§7A.10.2(B) Table 2
Wall signBusiness zones: no more than 30% of the area of each wall (40% within 250 ft of a freeway). Industrial zones: 40%. It may not rise above the facade, eaves, firewall or roofline. A further 25% of the wall is available if no other sign types are used§7A.10.2(C)(3)(d)
Monument signUp to 50 sq ft per face, 10 ft high, set back 20 ft from the curb to the leading edge§7A.10.2(C)(2)(a)(1)(i)
Low profile signUp to 60 sq ft per face, 8 ft high, two faces, set back twice its height from the curb, on a base at least 2 ft tall§7A.10.2(C)(2)(a)(1)(ii)
Pole signBusiness and industrial zones only. Up to 72 sq ft per face, 12 ft high, set back 30 ft from the curb. Needs 225 ft of street frontage, or 125 ft with four or more business addresses, plus pole covers§7A.10.2(C)(2)(a)(1)(iii), (C)(3)(b)
How many freestanding signsOne per street frontage, plus one more for each 150 ft of frontage beyond the first 300 ft. A sign on a local street takes one away from the arterial or collector allowance§7A.10.2(C)(2)(a)(2)
Window signNo permit; no more than 30% of the total window surface§7A.10.1(E)
Roof signProhibited, with a narrow exception for some National Register buildings. A sign on the face of a parapet counts as a wall sign§7A.8.2(F)
SetbackSigns sit on private property and at least 20 ft from the face of the curb unless a section says otherwise§7A.6.7

Source: City of Tucson Planning and Development Services, Unified Development Code Article 7A, Sign Standards (Ord. 11508, amended by Ord. 11803), posted on the City’s Sign Permits page; sections 7A.6.2, 7A.6.7, 7A.8.2, 7A.10.1, 7A.10.2; read on November 3, 2026.

A sign in Tucson is measured by the rectangle around its message, frame included, and a double-faced sign counts one face when the faces are parallel and no more than 5 ft apart (§7A.6.1). Sign height runs from average finished grade to the top of the copy (§7A.6.5). The Table 2 notes also say the first Heritage Landmark Sign on a premise does not count toward the total.

Check your sign against the limit

This applies the zone allowance in §7A.10.2(B), the wall share in §7A.10.2(C)(3)(d) and the freestanding limits in §7A.10.2(C)(2). It does not know your district overlay, the other signs already on the premise, or a variance, and a premise on several frontages should be run once per frontage.

Calculated from UDC Article 7A, §7A.10.2(B) Table 2 and §7A.10.2(C), read on November 3, 2026. The fee figures are from the City’s Sign Fees sheet.

How much does a Tucson sign permit cost?

The City publishes a one-page Sign Fees sheet adopted October 31, 2022, linked from its Sign Permits page. It adds up three pieces: a permit fee set by the total value of the sign work, plan review fees for each review the sign triggers, and a technical archive fee. We read it on November 3, 2026.

Total sign valuePermit fee
$1.00 to $2,000.00$82.50
$2,000.01 to $5,000.00$123.75
$5,000.01 to $8,000.00$165.00
$8,000.01 to $12,000.00$247.50
$12,000.01 to $15,000.00$330.00
$15,000.01 to $20,000.00$371.25
$20,000.01 to $30,000.00$412.50
$30,000.01 to $40,000.00$453.75
Over $40,000.00$618.75
Added on top, per permitAmount
Technical archive fee$16.50
Electrical review$82.50
Structural review (engineered plans)$165.00
Pedestrian Business District review (for example a projecting sign)$165.00
Historic or Historic Landmark Overlay review$165.00
Neighborhood Preservation Zone review$82.50
Planned Area Development or Scenic Corridor Zone review$330.00 each
Infill Incentive, Urban Overlay or Rio Nuevo district review$247.50
New freeway sign or billboard review$495.00
Master Sign Program staff review$330.00 (portable signs: $165.00)

Sources: City of Tucson Permanent Sign Permit Fees sheet (PDF, adopted October 31, 2022, read as an image because the PDF has no text layer) and the Sign Permits page; UDC §7A.4.6; read on November 3, 2026.

How to apply for a Tucson sign permit — 4 steps
1. Size the sign to your zone
Work out the total area for your street frontage and the limit for the sign type (§7A.10.2). A new freestanding sign also needs a site plan showing setbacks from the curb and the sight visibility triangles.
2. Build the drawing set
The City’s Sign Review Checklist (revised 6/30/2026) lists what to include: a location map or site plan, an elevation photo with dimensions and the frontage, wall construction and anchor details, the disconnect switch, the amperage, and a sign view with its square footage. Freestanding signs also need footing details and stamped engineering.
3. Use the contractor portal
PDSD says permanent sign permit applications and plans go in through Tucson Development Center Online, submitted by sign contractors. Where the State requires a license, the permit can be issued only to a licensed contractor (§7A.4.1(A)(3)).
4. Pay and pass the inspection
Pay the fees on the sheet above. A site review inspection is required on every permit except portable and temporary signs, and detached signs needing engineering get a footing inspection (§7A.4.4(D)). Questions go to [email protected] or (520) 791-5550.

Steps from the City’s Sign Review Checklist and Sign Permits page, and UDC §7A.4.1 and 7A.4.4, read on November 3, 2026.

How long it takes

Neither Article 7A nor the City’s sign pages give a number of days for review. The Sign Permits page says only that timing questions go to the sign permits email. A permit then runs on a clock of its own: it lapses if work is not started within 180 days of the permit date, or if work is suspended or abandoned for 180 days (§7A.4.2(D)(1)). Restarting after a lapse of a year or less, with no plan changes, costs half the original fee; after more than a year the full fee applies. One extension of up to 180 days is possible when circumstances outside the holder’s control blocked the work (§7A.4.2(D)(2)).

Sources: City of Tucson Sign Permits page; UDC Article 7A §7A.4.2(D); read on November 3, 2026.

Signs that need no sign permit — 5 items
  • Window signs: allowed wherever wall signs are, with no permit, as long as they cover no more than 30% of the window surface. City Code §7-411 also limits window coverage (§7A.10.1(E)).
  • Listed exempt signs: non-commercial flags, emblems and insignias; a permanent sign cut into the surface of a facade or building; non-commercial murals; commercial murals in pedestrian districts; and manned hot air balloons. They do not count toward your allowance (§7A.8.1(A)).
  • Interior signs: signs inside a building, courtyard or hallway, or not readable from the public right-of-way, skip zoning review but may still need building code review. Outdoor ones larger than 12 sq ft that the street can see do count toward the allowance (§7A.10.1(B)).
  • Change of copy: the Sign Review Checklist says no permit is needed when the sign is under 35 sq ft, and a permit with drawings of the cabinet when it is larger. The fee sheet instead marks the change-of-copy fee for signs of 50 sq ft or more (see what we could not confirm).
  • Government and safety signs: emergency, warning and governmental signs are permitted throughout the city (§7A.10.1(A)).

Sources: UDC Article 7A §7A.8.1, 7A.10.1; Sign Review Checklist, Rev. 6/30/2026; read on November 3, 2026. Even an exempt sign in a Historic Preservation Zone goes to design review (§7A.8.1(B)).

Sidewalk signs and projecting signs

Tucson treats an A-frame as a portable sign with its own set of rules.

Source: UDC Article 7A §7A.10.3(C)(1), 7A.10.2(C)(3)(c), 7A.8.4 and 7A.6.10, read on November 3, 2026.

Banners, digital signs and other types — 5 items
  • Wall-mounted banner: one per street frontage, 90 sq ft at most, commercial and industrial zones only, with every corner fixed to the wall. Permits come in 90-day increments and total no more than 90 days in a calendar year, except that a banner advertising a business through construction can be renewed until the work ends (§7A.10.4(A)(2)).
  • Flags and feather banners: in commercial and industrial zones a business may swap the portable sign allotment for four commercial flags, feather banners or banner flags in two colors, plus one more portable sign (§7A.10.3(C)(2)).
  • Balloons, pennants and propellers: one fixed balloon of 2 ft or more is permitted for 90 days and may be displayed for up to 10 consecutive days at a time. Propellers, hula strips, small balloons and pennants run in 90-day periods, 180 days a year at most (§7A.10.4(A)(1), (3)).
  • Digital signs: copy may change no more than once a minute, with no transitions or animation (§7A.6.4(C)). Flashing, moving and animated signs are prohibited unless they are Heritage Landmark Signs (§7A.8.2(B), (E)).
  • Portable allotment: ground-mounted portable signs in business and industrial zones may total 32 sq ft on a local street, 64 on a collector and 128 on an arterial, with no lighting (§7A.10.3(A), (B)).

Source: UDC Article 7A §7A.10.3 to 7A.10.4, 7A.6.4 and 7A.8.2, read on November 3, 2026.

What we could not confirm

Checked against UDC Article 7A, the Sign Fees sheet, the Sign Review Checklist and the Sign Permits page on November 3, 2026.

Tucson sign permit questions

Do I need a permit for a new storefront sign in Tucson?
Almost always. Erecting, reinstalling, altering, repairing, relocating or changing the copy of a sign without a permit is a civil infraction, and each day it stays up counts as a separate offense (UDC §7A.4.1(A)(1), (2)). Window signs covering no more than 30% of the glass need no permit (§7A.10.1(E)), and a short list of flags, murals and carved signs is exempt (§7A.8.1(A)).
How big can my Tucson sign be?
In the general business zones the total permanent sign area is 3 sq ft for every lineal foot of street frontage; in industrial zones it is 4 sq ft per foot (UDC §7A.10.2(B), Table 2). A wall sign may also take no more than 30% of the wall it sits on in business zones, or 40% in industrial zones (§7A.10.2(C)(3)(d)).
What does a Tucson sign permit cost?
The permit fee depends on the total value of the sign work: $82.50 for $1 to $2,000, rising to $618.75 above $40,000. Plan review fees are added for each review the sign needs, such as $82.50 for electrical and $165 for structural, and every permit carries a $16.50 technical archive fee (City Sign Fees sheet adopted October 31, 2022).
Can I put an A-frame sign on the sidewalk in Tucson?
Only in the right-of-way with a temporary revocable easement. An A-frame may be up to 30 inches tall and 30 inches wide, one per business, taken in at closing, and it needs a city decal (UDC §7A.10.3(C)(1)). It must sit at least two feet back from the curb and leave four feet clear for walking.

Answers from UDC Article 7A, the City’s Sign Fees sheet and Sign Permits page, read on November 3, 2026.

Not sure how the code reads for your sign?

Send your dimensions and we will reply with how Tucson’s sign code reads for that sign, at no charge. We are not a sign contractor and do not file permits.

Send your sign details →
This guide summarizes the public Tucson Unified Development Code (Article 7A, Sign Standards) and the City’s published sign permit pages. It is not a permit, legal advice or a promise that a sign will pass review. Overlay districts, historic areas and special districts can change the answer, so confirm with Tucson PDSD before you design, order or install.

Other US city sign guides

New YorkChicagoLos AngelesDallasAtlantaPhiladelphiaSan FranciscoMiamiFort WorthPhoenixAustinHoustonSan DiegoSan AntonioDenverJacksonvilleColumbusIndianapolisCharlotteBostonLas VegasNashvilleSacramentoSeattlePortlandAlbuquerqueBaltimoreHonoluluFort CollinsTucsonFort CollinsFees by city
Sources & how this page is maintained

Sources and official references: Tucson Unified Development Code, Article 7A · City Sign Permits page · City Sign Fees sheet · City Sign Review Checklist

Last inspected against the official code: November 2026 · confirm current rules with the city before you file

Not sure your sign qualifies? Send your dimensions and we will tell you how Tucson’s code reads for it →

Ask us how the code reads for your sign

Send your dimensions and we will reply with what Tucson’s sign code allows for that sign. No charge. We are not a sign contractor and not a permit agent.